Hutto High School No 2

My part in this project was compositing our model over the real world footage of the Hutto High School site. I was also character lead, animation, lighting, and rendering. Compositing our model over the video footage was done in Syntheyes and rendered in Unreal Engine.

• Official Name: Creekside High School
• Mascot: Hippo (retained from district tradition)
• Location: 301 Destiny Ln, Hutto, TX 78634 (current Hutto Ninth Grade Center site)
• Opening Date: Scheduled to open in Fall 2027 (with active construction underway since summer 2025)
• Capacity & Design: Designed to expand up to a 2,400-student capacity, featuring a multi-story main academic building, Career and Technology Education (CTE) spaces, a competition gym, a field house, an auditorium, and a detached fine-arts hall

Aerial Composite

Aerial Composite

Athletic Entry

Athletic Entry

Auditorium

Auditorium

Auditorium Entry

Auditorium Entry

Collaboration Area

Collaboration Area

Gymnasium

Gymnasium

Gymnasium Lobby

Gymnasium Lobby

Library

Library

Library Hall

Library Hall

Student Entry

Student Entry

Welding Shop

Welding Shop